Procurement is the purchasing process for goods and services. On a construction project, procurement may be used to purchase design services, construction works, goods, mateirals and so on.
The team that carry out this process (or part of it) may be described as a procurement team. Their functions are typically conducted via a tendering process and may involve; defining procurement packages, preparing tender documents, identifying suitable suppliers, assessing tender submissions, negotiating and agreeing terms and so on.
They will typically work for contractor or developer, and ensure the design and construction of a building is procured according to a strategy that meets both their own commercial needs and the objectives of the client. Typical considerations are likely to include speed, cost, quality, specific project constraints, risk, ownership, financing, insurance and warranties, track record, market conditions and so on.
A procurement team (which my range from a single individual to a whole department) is usually necessary as projects are complex, with many suppliers and defined timescales, and contractors may be inundated with offers from suppliers. It is the job of the procurement team to manage suppliers and develop purchasing strategies that meet the requirements of the project.
The procurement manager who may lead the procurement team will usually be responsible for developing a clear procurement strategy for the purchase of goods and services. They may be part of a wider finance team and will typically be a qualified, mid- to senior-level management individual.
The members of a procurement team will usually be professionals who are experienced in providing essential services and skills related to the purchase of materials and supplies for the building project. They may have relevant educational qualifications in business, purchasing, quantity surveying, construction management and so on, but usually, there are no specific requirements to have procurement-related qualifications. Some procurement managers and team members may simply have long and valued experience in the area. However, qualifications options are available, for example through the Chartered Institute of Procurement and Supply (CIPS).
The individuals working for a procurement manager may be organised so that each is responsible for procuring certain aspects of a construction contract e.g materials for substructure, superstructure, fit-out etc.
[edit] Related articles on Designing Buildings Wiki
- Admeasurement
- Automated vendor selection.
- Construction contract
- Construction manager
- Design and build procurement route
- Design build finance and operate
- Engineering procurement and construction contract
- Fast track construction
- Framework contract
- Guaranteed maximum price for construction contracts
- Lump sum contract
- Management contractor
- Managing the procurement process
- OJEU procurement procedures
- Private finance initiative
- Procurement plan.
- Procurement route options pros and cons
- Public private partnerships PPP
- Public procurement
- Single-stage tender
- Tender processes for construction contracts
- Traditional contract for construction
- Two-stage tender
- Typical tender process for construction projects.
[edit] External references
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.